The main operating costs, other than coal costs, are related to the
milling and distribution of the
coal to the blast furnace. LV coals, compared to HV coals, are generally softer and thus requiring
less energy to grind, but they require a higher energy to dry the coal down to a moisture level
required to eliminate the risk of handling problems.
Moisture in the pulverised coals can lead to handling problems in the PF bins and transport
system. Clays in the coal may worsen the handling problems associated with moisture.